• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News Paraguay highway project delayed

Paraguay highway project delayed

Work to improve a major highway connection in Paraguay has been delayed, but will be completed shortly. A consortium, Rutas del Este, is carrying out the work to improve the stretch of Ruta 2 from San Lorenzo to Ypacaraí. The consortium is headed by contractor Sacyr and has been carrying out the work for the PPP deal to upgrade the Ruta 2 and Ruta 7 highways between Ypacarai and Pastoreo.

by Sarah Biswell
November 9, 2018
in News
Reading Time: 1 min read
A A

Work to improve a major highway connection in Paraguay has been delayed, but will be completed shortly. A consortium, Rutas del Este, is carrying out the work to improve the stretch of Ruta 2 from San Lorenzo to Ypacaraí. The consortium is headed by contractor Sacyr and has been carrying out the work for the PPP deal to upgrade the Ruta 2 and Ruta 7 highways between Ypacarai and Pastoreo.

Categories: Road Structures
Promoted Content Header
Sacyr VIEW COMPANY
Work is now starting on a new bridge to replace the existing Calcasieu River Bridge carrying I-10 in Louisiana – (image: Typhoonski/Dreamstime.com)
News

New $2.3 billion Louisiana bridge

June 10, 2026
A new highway stretch in Texas provides a bypass around Diboll – image courtesy of Sacyr
News

Sacyr completes $146 million Texas project

January 16, 2026
Work will commence for Louisiana’s new Calcasieu River Bridge in 2026 – image courtesy of © Typhoonski| Dreamstime.com
News

$2.4 billion Louisiana bridge

November 11, 2025
The court denial for the €13.5 billion structure comes as some news websites reported that the construction company appointed to build the suspension bridge had started recruiting (image courtesy Stretto di Messina)
News

Italy’s Messina Bridge faces further delays

November 4, 2025

Related Posts

A new highway link connects Basrah in Iraq with Faw Port – (image: Dynamoland/Dreamstime.com)

Key Iraq highway link complete

by Mike Woof
July 15, 2026

A key stage of the $17 billion road link between Iraq and Turkey is complete

A new stretch of road in the Czech Republic will improve traffic flow around the capital Prague – (image: Micka/Dreamstime.com)

23 bridges for Czech highway project

by MJ woof
July 14, 2026

A new highway in the Czech Republic is benefiting from the construction of 23 bridges

Subsidence stemming from climate change presents a major risk to key infrastructure – (image: Prime Global Publishing)

Subsidence from climate change threatens key infrastructure

by Mike Woof
July 14, 2026

Climate change is causing subsidence and threatening key infrastructure

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited