• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News £355 million Hull road project delayed

£355 million Hull road project delayed

A £355 million road project for the UK city of Hull road has been delayed.

by Mike Woof
December 23, 2024
in News
Reading Time: 1 min read
A A
A major new road project for the UK city of Hull is facing delays – image courtesy of © Grandmaisonc| Dreamstime.com

A major new road project for the UK city of Hull is facing delays – image courtesy of © Grandmaisonc| Dreamstime.com

The £355 million project to upgrade the A63 dual carriageway in the UK city of Hull now looks to face delays. The project was to have been completed in the second quarter of 2025 but will now be delayed until the second quarter of 2026. Extremely challenging ground conditions have been given as the cause for the delay.

The final part of the project is the construction of a 400m underpass stretch and it is this that is facing the delays due to touch geological conditions. The underpass will carry traffic under a new road section that links Ferensway and Commercial Road.

The project will cut traffic congestion in Hull’s redeveloped waterfront area when complete. The project is being managed by National Highways.

Categories: Road Structures
Promoted Content Header
National Highways VIEW COMPANY
The bypass project for Newark in the UK has now been cancelled – (image: Wirestock/Dreamstime.com)
News

£297 million bypass project in the UK cancelled.

July 1, 2026
Building the new Lower Thames Crossing in the UK is essential to reduce traffic jams on the existing Dartford Crossing, but there is concern over the cost of the project – (image: John Kavanagh/Dreamstime.com)
News

UK £11 billion tunnel project: costs climbing

June 8, 2026
ID 100610800 ©  Gorgios | Dreamstime.com
News

£27 billion for UK road improvements

March 30, 2026
Work is starting on the important Lower Thames Crossing project in the UK – image courtesy of National Highways
News

Lower Thames Crossing: work starting

March 9, 2026

Related Posts

A new highway link connects Basrah in Iraq with Faw Port – (image: Dynamoland/Dreamstime.com)

Key Iraq highway link complete

by Mike Woof
July 15, 2026

A key stage of the $17 billion road link between Iraq and Turkey is complete

A new stretch of road in the Czech Republic will improve traffic flow around the capital Prague – (image: Micka/Dreamstime.com)

23 bridges for Czech highway project

by MJ woof
July 14, 2026

A new highway in the Czech Republic is benefiting from the construction of 23 bridges

Subsidence stemming from climate change presents a major risk to key infrastructure – (image: Prime Global Publishing)

Subsidence from climate change threatens key infrastructure

by Mike Woof
July 14, 2026

Climate change is causing subsidence and threatening key infrastructure

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited