• About
  • Advertise
  • Contact
Saturday, July 18, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home Products Water Cable Barrier from TrafFix

Water Cable Barrier from TrafFix

The Water Cable Barrier’s cable-linked design is engineered to keep vehicles from intruding into work zones.

by David Arminas
January 8, 2026
in Products
Reading Time: 2 mins read
A A
An internal galvanised steel cable system connects each barrier segment, forming a continuous protective line that effectively intercepts and restrains vehicles during an impact (image courtesy TrafFix)

An internal galvanised steel cable system connects each barrier segment, forming a continuous protective line that effectively intercepts and restrains vehicles during an impact (image courtesy TrafFix)

TrafFix Devices, a manufacturer and supplier of traffic control devices and crash attenuation products, has launched the Water Cable Barrier for highway and work zones.

TrafFix said the system, for both highways contractors and highways agencies, is the world’s first longitudinal barrier to be MASH tested, passed and eligible at TL-1 50kph (31mph) and TL-2 70 kph (43.5mph ) levels – with or without chain link fence paneling. It sets a new standard for safety performance.

The internal galvanised steel cable system connects each barrier segment, forming a continuous protective line that effectively intercepts and restrains vehicles during an impact. Unlike standard channelising devices, which may permit vehicles to break through at high speeds, the Water Cable Barrier’s cable-linked design is engineered to keep vehicles from intruding into work zones, substantially enhancing onsite security. TrafFix said that this advanced containment approach offers heightened peace of mind for teams operating in active traffic environments.

Built with premium polyethylene and UV stabilisation, the barrier resists fading, cracking and breakage, ensuring reliable field performance and long service life through tough weather and repeated use. A double-wall knuckle safeguards hinge points, minimising breakage and downtime. Field crews benefit from an oversized fill-hole and secure twist-lock cap for faster filling and secure water retention. Meanwhile, a tamper-resistant drain plug with coarse, buttress threading streamlines maintenance and eliminates cross-threading issues.

A Water Cable Barrier measures 193cm (76 inches) long, 81.3cm (32 inches) high, and 45.7cm (18 inches) wide.
A Water Cable Barrier measures 193cm (76 inches) long, 81.3cm (32 inches) high, and 45.7cm (18 inches) wide. 

Deployment efficiency is further enhanced by forklift and pallet jack slots for rapid repositioning, plus a hinged design that allows up to 30 degrees of pivot between sections. Each barrier comes standard with a galvanised steel connection pin, allowing sections to be securely linked into a continuous protective wall.

The newly available corner piece enables versatile 90-degree angles for custom site layouts and boundary configurations. Barriers stack for compact transport and storage, reducing logistical costs, with each unit featuring a steel connection pin for secure linking on busy job sites.

The system is available in high-visibility orange and white, with custom colors on request.

A Water Cable Barrier measures 193cm (76 inches) long, 81.3cm (32 inches) high, and 45.7cm (18 inches) wide.

Empty, it weighs just 45.3kg (100 pounds) for easy handling, but delivers heavy-duty impact resistance at 530.7kg (1,170 pounds) when filled.

These attributes make it an ideal solution for professionals managing construction, infrastructure, event safety and emergency sites.

Categories: Highway & Network Management
Promoted Content Header
TrafFix Devices VIEW COMPANY
The TrafFix-developed SLED mini-E crash cushion for work zones has passed testing to EN1317-3 with Impact Severity Level A at 80kph (image courtesy TrafFix Devices)
Products

Major protection with the SLED mini-E cushion

April 20, 2026
A steel connection and keeper pin system ensures secure interlocking between sections, while molded-in forklift and pallet jack slots allow for easy transport and positioning
Products

Go with the flow with TrafFix Devices’ Water Wall

April 15, 2025

Related Posts

(Image: CIFA)

CIFA introduces the new K60H with 7-section boom: a new benchmark in the 60-metre class

by Sarah Biswell
July 10, 2026

CIFA expands its CARBOTECH range with the introduction of the new K60H with 7-section boom, a truck-mounted concrete pump designed...

Better visibility, more order, more convenience: The new SUPER 800-5 P min paver from Vögele offers numerous advantages.

Market launch for new mini road paver from Vögele

by Sarah Biswell
July 6, 2026

Market launch for new mini road paver from Vögele

The W 200 F combines high milling performance with innovative automation solutions and. in particular, addresses the needs of users looking for efficiency and flexibility in a compact machine concept.

The W 200 F with MILL ASSIST impresses on the Latin American market

by Sarah Biswell
July 6, 2026

The large milling machine combines smart machine control with automated documentation

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited