• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News Tanami Road to be sealed for 314km

Tanami Road to be sealed for 314km

Sealing part of the 1,077km Tanami Road in Australia’s outback could transform local farming.

by David Arminas
May 24, 2022
in News
Reading Time: 2 mins read
A A
Heavy going: the mostly gravel Tanami Road - also known as the Tanami Track, Tanami Highway and the McGuire Track - runs across Australia’s remote northern outback (image  ©Adwo/Dreamstime)

Heavy going: the mostly gravel Tanami Road - also known as the Tanami Track, Tanami Highway and the McGuire Track - runs across Australia’s remote northern outback (image ©Adwo/Dreamstime)

Part of the remote and mostly gravel 1,077km-long Tanami Road that connects several rural communities in northern Australia is to get a sealing upgrade.

The state government of Western Australia recently earmarked nearly US$347 million to seal the 314km stretch of the Tanami Road that runs between the town of Tanami and the state’s border with the Northern Territory.

Meanwhile, around 700km of the highway is within the Northern Territory – the section that many critics have said is the worst part of the entire road. Heavy goods vehicles are often slowed to 35kph or less depending on the corrugation of road or during the rare wet weather conditions.

However, the project, which is expected to transform the economies along the road through some of the country’s harshest outback, could take up to a decade to complete, according to Australian media.

The Tanami Road – also known as the Tanami Track, Tanami Highway and the McGuire Track – runs between the Stuart Highway in the Northern Territory and the Great Northern Highway in Western Australia. It is also known as State Route 5 in the Northern Territory. Its southern junction is 19km north of Alice Springs and the northern junction is 17km south-west of Halls Creek.

Only about 20% of the road is bitumen making it best navigated by four-wheel drive vehicles. It is also a major long-haul trucking route. In January 2020, Australia’sfederal government committed US$165 million to upgrade and seal the road.

Local politicians and economists have long been saying that turning the 314km dirt section of the road into a highway would allow mining and agriculture to be profitable in the more remote areas.

Categories: Asphalt Milling, Paving & Compaction

Related Posts

A new highway link connects Basrah in Iraq with Faw Port – (image: Dynamoland/Dreamstime.com)

Key Iraq highway link complete

by Mike Woof
July 15, 2026

A key stage of the $17 billion road link between Iraq and Turkey is complete

A new stretch of road in the Czech Republic will improve traffic flow around the capital Prague – (image: Micka/Dreamstime.com)

23 bridges for Czech highway project

by MJ woof
July 14, 2026

A new highway in the Czech Republic is benefiting from the construction of 23 bridges

Subsidence stemming from climate change presents a major risk to key infrastructure – (image: Prime Global Publishing)

Subsidence from climate change threatens key infrastructure

by Mike Woof
July 14, 2026

Climate change is causing subsidence and threatening key infrastructure

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited