• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News New South Wales backpedals over WestConnex cycling bridge

New South Wales backpedals over WestConnex cycling bridge

Controversy has again hit Australia’s WestConnex project in Sydney with media reports the a planned cycle and pedestrian bridge is to be axed. In its place will be a new raised flyover running through the residential and parkland area, according to a report in The Age newspaper. The Pedestrian and Cycling Green Link was part of the original planning permission for the US$11.85 billion WestConnex project and was to rise above parts of the surface motorway in Rozelle and Lilyfield neighbourhoods. The

by Sarah Biswell
April 30, 2019
in News
Reading Time: 1 min read
A A

Controversy has again hit Australia’s WestConnex project in Sydney with media reports that a planned cycle and pedestrian bridge is to be axed.

In its place will be a new raised flyover running through the residential and parkland area, according to a report in The Age newspaper.

The Pedestrian and Cycling Green Link was part of the original planning permission for the US$11.85 billion WestConnex project and was to rise above parts of the surface motorway in Rozelle and Lilyfield neighbourhoods.

The 33km WestConnex motorway, which runs mostly underground, is a joint project of the New South Wales state government and the Australian government. It includes widening and extending the M4 Western Motorway, a new section for the M5 Motorway and a new inner western bypass of Sydney’s central business district to connect the M4 and M5. Work includes 16km of new tunnels as well as widening 7.5km of the existing M4 and which will converted to a private tollway.

To help fund the project, the publicly-owned M5 East Motorway will be converted to a private tollway, while the toll on the existing M5 will be extended for a further 34 years.

Categories: Road Structures
Promoted Content Header
New South Wales State Government VIEW COMPANY

Related Posts

A new highway link connects Basrah in Iraq with Faw Port – (image: Dynamoland/Dreamstime.com)

Key Iraq highway link complete

by Mike Woof
July 15, 2026

A key stage of the $17 billion road link between Iraq and Turkey is complete

A new stretch of road in the Czech Republic will improve traffic flow around the capital Prague – (image: Micka/Dreamstime.com)

23 bridges for Czech highway project

by MJ woof
July 14, 2026

A new highway in the Czech Republic is benefiting from the construction of 23 bridges

Subsidence stemming from climate change presents a major risk to key infrastructure – (image: Prime Global Publishing)

Subsidence from climate change threatens key infrastructure

by Mike Woof
July 14, 2026

Climate change is causing subsidence and threatening key infrastructure

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited