• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home Features Efficient dozing with Liebherr

Efficient dozing with Liebherr

Liebherr’s latest Generation 8 dozers offer a higher level of machine control than ever before

by Mike Woof
May 31, 2022
in Features
Reading Time: 3 mins read
A A
The IMUs on the Generation 8 machines allow precision working without the need for GNSS systems or base stations

The IMUs on the Generation 8 machines allow precision working without the need for GNSS systems or base stations

Bulldozers were amongst the first items of construction equipment to benefit from the use of machine control technology. These machines are amongst the most complex to drive properly and with a global shortage of operators for equipment of all types, the use of machine control technology has become increasingly important.

Liebherr is taking the use of machine control systems to new heights with the introduction of its Generation 8 dozers. The latest machine in the range is the Generation 8 version of the PR 766, Liebherr’s 54tonne class dozer, joining the line-up of PR 716-PR 756.

Productivity, versatility and efficiency are said to be important features of the Generation 8 models. The machines benefit from very low working noise, low engine speeds and hydro-elastic cab mounts that ensure smoother operation, while the large cabs offer a good all-round view for maximum visibility.

However, the most important feature of the Generation 8 units comes in the shape of the latest operator assistance technology.

The dozers offer three levels of machine control. The onboard Liebherr systems are based around inertial navigation (IMU) technology and operate independently of GPS, an important benefit for some sites where satellites may be obscured. The automatic free grade system uses two IMUs, one of which is mounted on the blade while the other is on the machine.

The first level uses the IMUs to achieve active blade stabilisation. This means that the blade will effectively float so as to ensure an optimum load, and preventing the ‘washboard’ effect caused by an inexperienced operator over-correcting. The systems helps to increase productivity and saves time, while also boosting safety as the operator can focus on driving the machine rather than having to concentrate on how much material is behind the blade.

The Generation 8 dozer cabs come from a supplier in Germany but are built to LWT's design and offer good all-round visibility
The Generation 8 dozer cabs come from a supplier in Germany but are built to LWT’s design and offer good all-round visibility

The second level allows basic modelling of 2D surface, providing automatic and active position control of the blade to a specified target inclination. The operator can set the definition and choose blade inclination if required. As it also uses the Liebherr IMU technology, the system can operate without the need for GNSS receivers or base stations. A user can model a 2D surface without the need for a rotating laser and just needs to start with a reference point from the site surveyor. The blade then lowers automatically to the reference measurement, allowing the operator to deliver a 2D surface even over large distances and in different pushing directions. The system is also said to allow grading speeds that could not be achieved previously. As with the simpler level one system, this boosts productivity and allows the operator to focus on driving the machine rather than watching the load in the blade. Of note too is that the IMUs do not need regular calibration as would have been the case with earlier generation systems.

Meanwhile, the third level offers full 3D technology and uses systems from Topcon, Leica Geosystems or Trimble depending on the customer preference. These systems can be used to deliver BIM capabilities onsite. Sensors for the machine control systems are integrated into the hydraulics during manufacture, which makes installing the technology far simpler.

However, it is worth noting also that the operator assistance systems are optional for emergent markets with lower levels of regulations.

A range of other features help ensure high performance. All the Generation 8 dozers feature box-section chassis to eliminate deflection and ensure better grading. Liebherr was a pioneer of hydrostatic drives in dozers, which offer smooth transition between speeds as well as high precision and also lower wear rates on running gear, a key cost factor for bulldozer maintenance. To ensure reliability, the final drives incorporate sensors that detect leakage and warn operators of high temperatures.

With the LiDAT fleet management system, a customer can plan the next service and optimise scheduling for maintenance works. The system also allows the user to notify the service partner and order spare parts including express delivery using the myLiebherr app on a cellphone.

Categories: Connected ConstructionEarthmoving & Soil Compaction
Promoted Content Header
Liebherr VIEW COMPANY
Artist’s impressions of the Liebherr factory at Nambsheim where driver’s cabs for the group’s earthmoving machines will be manufactured from 2028 (Image: Liebherr)
News

Liebherr turns the sod for future Nambsheim plant

June 26, 2026
Hammering away in Hamburg
Features

Liebherr lands in Hamburg

May 15, 2026
The PR 756 crawler dozer at work on a road construction site, pushing and grading material with precision and efficiency
Features

Efficient solutions for modern road construction

April 10, 2026
New developments increase performance for Liebherr excavators
CONEXPO-CON/AGG 2026

Upgraded excavators offered by Liebherr

February 23, 2026

Related Posts

One of the tasks involved flipping bottles up from the ground (Image: Hitachi Construction Machinery Europe/HCME)

Europe’s best operators get ready for the LANDCROS Operator Challenge Final

by Sarah Biswell
July 10, 2026

More than 90 of Europe's most skilled excavator operators have showcased their skills in recent months by taking part in...

Road repairs work

The importance of road maintenance

by Staff Writer
July 10, 2026

Gülay Malkoc discusses the importance of investing in road maintenance.

The new 24litre engine from DEUTZ is designed for high-load genset applications - (image: Deutz)

High power generation from Deutz

by Mike Woof
July 8, 2026

Deutz is offering a rugged new engine to suit challenging power generation installations

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited