• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home Features Doka goes underground in Stockholm

Doka goes underground in Stockholm

Stockholm is growing faster than any other European city. But when it comes to traffic, the 1960s-era Essingeleden motorway is still the most important north-south connection and is frequently congested

by Sarah Biswell
March 17, 2022
in Features
Reading Time: 4 mins read
A A

To relieve the congestion, construction has been underway on the Förbifart Stockholm –the Stockholm Bypass.

Trafikverket, Sweden’s traffic authority, commissioned excavation of a tunnel – Sweden’s first circular design road tunnel – under the rugged land of skerries and holms and a good 18km of the 21km bypass route. The main focus of Doka’s work has been two circular tunnels in the Skärholmen district, built using the open-cut method, one at 130m long and the other at 160m.

This is also a first for the Swedish Doka team – a project set up using BIM, Building Information Modelling, the digital representation of physical and functional characteristics of a structure.

Doka’s SL-1 all-round model structure was used to create an SL-1 “model Stockholm bypass” structure because the tunnels were circular, like ones for underground railways. The team, led by Håkan Bratt, Doka’s project manager, adjusted the system so the local contractor Comsa received an economical rental solution to implement a tunnel format of this kind without complications.

Wheels and winches provide the necessary mobility for the systems, while an onsite service for precise cutting of wooden formwork beams shortens working distances. Instead of keeping two or three spares of each of the parts, their use is timed so that the construction company can manage with less material without experiencing shortages.

For safety, the Edge protection system XP was chosen. “It is user-friendly and can be used universally for all edge protection needs,” explained Lukas Palme, group leader for engineering at Doka Sweden.

As well as the two circular tunnels, including entrances and exits, the work includes two 20m-long routes in rocky terrain as well as a pair of trough structures, the expansion of existing infrastructure and numerous stabilisation measures along the route.

“We surprised Comsa with a 3D model on our own initiative,” said Jan Radlbauer, Doka’s head of engineering for Europe. The more complex the geometry, the more important it is to fully map the building space. Doka also drew the underlying model so that the customer could visualise it.

All employees are connected via their mobile devices and, therefore, are always up-to-date when construction data changes or an update is available. Problems are evaluated more quickly and errors rectified more easily than if everyone had to be individually briefed on the vast construction site.

BIM 360 and the design software Revit helped visualise the challenging tunnel geometries down to the smallest detail, especially the formwork constructions. When different countries are involved, data and sketches help everyone understand what’s going on. Participation such as this assures understanding by everyone about what their tasks are and they can discuss all manner of issues surrounding the tunnel construction.

“The BIM model helped us plan the works before execution since it gave us the unique ability  to see how everything would look in reality. This is very helpful when it comes to production and crane planning, especially when you combine the knowledge of a professional formwork supplier like Doka, an experienced subcontractor and our own expertise,” said Martin Klimt, block manager for concrete/formwork at Comsa.

As things stand, the six sections involving Doka will be handed over to the client on time and within budget after roughly five years of planning and construction. When the junctions between Kungens Kurva (King’s Curve) in the south and Häggvik in the north are approved for traffic- likely in 2025 – the Stockholm Bypass will be one of the three longest road tunnels in the world, helping to ensure that Stockholm continues to be one of the best places to live.

DOKA PRODUCTS USED

  • Framed formwork Frami and Framax
  • Large-area formwork Top 50
  • Heavy-duty supporting system SL-1
  • Load-bearing tower
  • Timber-beam floor formwork Dokaflex
  • Edge protection system XP
  • Services provided: planning, BIM, onsite service, pre-assembly service
Promoted Content Header
Doka VIEW COMPANY
The new bridge for India’s Missing Link on the Mumbai-Pune Expressway (shown here under construction) is now opening to traffic – image courtesy of Doka
News

India’s Missing Link opening

May 1, 2026
Doka 360 enables real-time insights and seamless coordination between field, office and equipment, moving construction towards faster, safer and more cost-efficient outcomes
CONEXPO-CON/AGG 2026

Doka 360 allows digital project oversight

February 23, 2026
Robert Hauser, chief executive of Doka: commitments only matter when they translate into action and measurable progress (image © Doka)
News

Doka joins the United Nations Global Compact

February 16, 2026
The Doka triple: SuperDek Slab Formwork, Xlife top Formwork Sheet and Shear Wall Climber with FormDrive
CONEXPO-CON/AGG 2026

Climb higher, safer, faster with Doka formwork

February 5, 2026

Related Posts

One of the tasks involved flipping bottles up from the ground (Image: Hitachi Construction Machinery Europe/HCME)

Europe’s best operators get ready for the LANDCROS Operator Challenge Final

by Sarah Biswell
July 10, 2026

More than 90 of Europe's most skilled excavator operators have showcased their skills in recent months by taking part in...

Road repairs work

The importance of road maintenance

by Staff Writer
July 10, 2026

Gülay Malkoc discusses the importance of investing in road maintenance.

The new 24litre engine from DEUTZ is designed for high-load genset applications - (image: Deutz)

High power generation from Deutz

by Mike Woof
July 8, 2026

Deutz is offering a rugged new engine to suit challenging power generation installations

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited