Costing US$3.9 billion, the massive Hampton Roads Bridge-Tunnel Expansion project in Virginia faces additional delays. This is one of the largest transport infrastructure projects in the US at present.
Costing US$3.9 billion, the massive Hampton Roads Bridge-Tunnel Expansion project in Virginia faces additional delays. This is one of the largest transport infrastructure projects in the US at present.
A new $15 billion bridge will span the Columbia River in the US.
Innovative road materials from Heidelberg Materials help improve roads in the UK.
The UK's £11 billion Lower Thames Crossing project will use a 5,000tonne TBM supplied by Herrenknecht, the largest of its...

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited
© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited