• About
  • Advertise
  • Contact
Saturday, July 18, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News Tarmac’s plan for cutting traffic disruption from roadworks

Tarmac’s plan for cutting traffic disruption from roadworks

Tarmac has a cunning plan for cutting traffic disruption from roadworks.

by Mike Woof
October 19, 2020
in News
Reading Time: 3 mins read
A A
Tarmac believes using warm mix asphalt could cut traffic delays from roadworks, as well as offering a more sustainable option for road construction

Tarmac believes using warm mix asphalt could cut traffic delays from roadworks, as well as offering a more sustainable option for road construction

Tarmac is calling for a new approach to road construction, in a bid to reduce traffic disruption. The firm says that a greater use of warm mix asphalt can make a major change and help to reduce traffic disruption arising from roadworks.
An online survey of 1,000 UK road users was commissioned by Tarmac and conducted by market research company 4media Group. This survey shows people believe traffic levels across the UK are almost back to pre-pandemic levels.
Nearly two thirds of motorists are making the same number of car journeys (or more) than prior to lockdown, and 41% are now travelling far more than they did a few months ago.
Essential roadworks play a key role in getting people moving but alongside the freedom to travel also comes the frustration of additional traffic delays, with 73% of those surveyed saying that their travel had been impacted by roadworks.
The survey also revealed that 71% of drivers believe traffic levels are the same or higher than pre-lockdown levels, with almost 25% having been stationary in traffic for up to 20 minutes per journey since lockdown restrictions were lifted.
To ease the problem, the UK’s leading construction solutions company is encouraging local authorities across the country to embrace new thinking in road building and repair through the increased use of warm mix asphalt to help get traffic moving more quickly.
The solution involves laying asphalt at lower temperatures than traditional mixes which means it can be laid faster, it sets quicker, is more sustainable to produce and enables roads to reopen more quickly.
As the UK Government continues to outline its plans to build back better and greener, with £100 million set aside for road repairs and improvements, Tarmac is calling on local authorities across the country to take action and help both the environment and road users by adopting warm mix asphalt as the default method of paving roads.
Warm mix asphalt is quick and easy to lay and requires less cooling time between courses, increasing the amount of material that can be laid in a standard shift – saving time and money.
It is estimated that this method of road building and repair could save 60,000tonnes of CO2/year nationally.
Despite these benefits, a report from the All Party Parliamentary Group (APPG) for Highways has stated that the widespread adoption of warm mix asphalt has so far failed to take place. The report notes that adoption of warm mix asphalt in the UK currently stands at less than 4%, lagging far behind the US (40%) and France (15%).
Brian Kent, national technical director at Tarmac, said: “As we begin our road to recovery from the COVID-19 pandemic, it has never been more important for the construction industry to work together with local authorities and councils to adopt more sustainable ways of working.
“With carbon reduction at the centre of the Government’s Construction Strategy and many local authorities working to achieve net zero targets by 2030, warm mix asphalt is a proven materials technology that benefits road users, residents living around areas of roadworks, highways workforce who spend less time exposed to traffic during roadworks, and the environment.
Categories: Materials
Promoted Content Header
Tarmac VIEW COMPANY
Videos

Building roads for a net-zero future with Tarmac: The A64 Bramham

December 16, 2025
A novel concrete grade is being used on a trial for a stretch of road in the UK - image courtesy of Tarmac
News

Sssshhhhhh! – quiet concrete on UK trial

January 14, 2025
Road building, maintenance and repair works can now be carried out with a view to reducing climate change
News

Beyond cost: forging a solutions-led partnership for highways carbon-saving

December 30, 2024
A warm mix asphalt was used together with a pioneering CarbonSink bio-component binder from Shell, which locks carbon into the road to prevent it being released into the atmosphere
News

Tarmac goes low-carbon on UK’s A64

December 20, 2024

Related Posts

A new bridge link will connect Oregon State and Washington State in the US

New $15 billion Interstate bridge between Oregon and Portland

by Mike Woof
July 17, 2026

A new $15 billion bridge will span the Columbia River in the US.

Sustainable road construction from Heidelberg Materials for North Yorkshire

Low carbon road repairs in North Yorkshire

by Mike Woof
July 17, 2026

Innovative road materials from Heidelberg Materials help improve roads in the UK.

A TBM will drive a new tunnel under the the River Thames from Tilbury

Biggest Herrenknecht TBM for £11 billion UK project

by MJ woof
July 16, 2026

The UK's £11 billion Lower Thames Crossing project will use a 5,000tonne TBM supplied by Herrenknecht, the largest of its...

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited