• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home Features Preparing a raceway with milling machinery

Preparing a raceway with milling machinery

by Sarah Biswell
November 6, 2018
in Features
Reading Time: 3 mins read
A A
Cat_PM822_PikesPeak 650.jpg

A Caterpillar milling machine has carried out important work on the Pikes Peak road link

Contractor Continental Milling has played an important role in refurbishing the famous Pikes Peak Highway route in the US state of Colorado

Working as a subcontractor for the Kiewit Corporation on the mill and overlay project, the Continental Milling crew was responsible for milling patches up to 213.4m long on the winding, two-lane highway known for its switchback turns and scenic vistas. The work was needed to prepare the route for the annual Pikes Peak International Hill Climb.

Pikes Peak Highway features some very steep grades, both cross slope and running slope. Chris Neeley, co-owner and program manager for Continental Milling said, “We have some areas that are exceeding 12% on a running slope with a cross slope close to eight percent on some of the switchback turns,” Neeley said.

The cold planer’s optional grade control provided precision control necessary to successfully mill the site’s steep grades. Continental Milling’s work ranged from edge milling to full depth 50.8mm cuts. Some of the patches were half-width, but the majority were the full width of the roadway.

“There’s high spots and low spots, so there’s areas where we’re cutting two inches and others where we’re cutting nothing,” said Raymond Trout, operations manager.

With the hill climb just three weeks after the mill and overlay, work was completed on a tight schedule. The Continental Milling crew had to mill approximately 3,344.5m2 of material in just two and a half days, with all work done at 4,078.2m and higher. “We had to work around traffic, and Kiewit was required to pave behind us as we opened up the patches,” Neeley said. “It was a challenge.”

A Cat PM822 Cold Planer was used on the job. “It has more power than the Cat PM200 Cold Planer that we own. We’re working at 14,000feet (4,267.2m) near the summit, so we need that additional help,” Neeley said of the 563kW machine. “We worked uphill, which is a little bit outside the norm for us, and the machine did great.”

“It performed above and beyond what our initial thoughts were with power loss at that elevation,” Neeley noted. “We needed to be efficient, and we needed to be productive.”

Work began at the last section of the 31km roadway, with the last patch completed where the asphalt ends at the summit. Transporting the equipment to the jobsite proved to be the greatest challenge. Tracking the cold planer up and down the mountain roadway took 22 hours. A lowboy trailer transporting the machine made it to an elevation of around 2743m, but was unable to negotiate the switchback turns beyond that point. The PM822 tracked the remaining 17.7km to reach the jobsite.

The Pikes Peak Highway mill and overlay is the highest profile job so far for Continental Milling.

The Pikes Peak Highway is a 31km road that enables vehicles to drive to the 4,302m summit of Pikes Peak. The mountain is located in Pike National Forest, 19km west of downtown Colorado Springs, Colorado. The road has a series of switchbacks, which are treacherous at high speed.

The Pikes Peak International Hill Climb, also known as the Race to the Clouds, is an annual automobile and motorcycle competition to the mountain’s summit. The 20km track on the Pikes Peak Highway traverses 156 turns, and climbs 1,440m from start to finish, while grades on the course average 7.2%.

Categories: Recycling
Promoted Content Header
CAT VIEW COMPANY
Caterpillar’s long reach boom can be used for bridge demolition or car park demolition works
Products

Long reach versatility for demolition

July 16, 2020
Euro Auction Dubai Sep 17-89.jpg
Features

Dubai machine sale for Euro Auctions

May 11, 2018
Brokk_SanAntonioBridge_NightBreaking.JPG
Products

Highway project in Texas required demolition equipment

May 1, 2018
MB-R800_Cat_Demolition_Concrete_Mexico.jpg
Products

MB drum cutter unit for demolition project in Mexico

February 6, 2018

Related Posts

One of the tasks involved flipping bottles up from the ground (Image: Hitachi Construction Machinery Europe/HCME)

Europe’s best operators get ready for the LANDCROS Operator Challenge Final

by Sarah Biswell
July 10, 2026

More than 90 of Europe's most skilled excavator operators have showcased their skills in recent months by taking part in...

Road repairs work

The importance of road maintenance

by Staff Writer
July 10, 2026

Gülay Malkoc discusses the importance of investing in road maintenance.

The new 24litre engine from DEUTZ is designed for high-load genset applications - (image: Deutz)

High power generation from Deutz

by Mike Woof
July 8, 2026

Deutz is offering a rugged new engine to suit challenging power generation installations

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited