• About
  • Advertise
  • Contact
Saturday, July 18, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News New Zealand expressway project delayed

New Zealand expressway project delayed

Construction of New Zealand’s Otaki to Peka Peka expressway is delayed. The route was due to open in 2020 but will not now be complete until 2021. The 13km link will feature four lanes and form part of the Kapiti expressway. The construction of this expressway section is costing US$212.5 million (NZ$330 million).

by Sarah Biswell
April 1, 2019
in News
Reading Time: 1 min read
A A

Construction of New Zealand’s Otaki to Peka Peka expressway is delayed. The route was due to open in 2020 but will not now be complete until 2021. The 13km link will feature four lanes and form part of the Kapiti expressway. The construction of this expressway section is costing US$212.5 million (NZ$330 million).

Categories: Road Structures

Related Posts

A new bridge link will connect Oregon State and Washington State in the US

New $15 billion Interstate bridge between Oregon and Portland

by Mike Woof
July 17, 2026

A new $15 billion bridge will span the Columbia River in the US.

Sustainable road construction from Heidelberg Materials for North Yorkshire

Low carbon road repairs in North Yorkshire

by Mike Woof
July 17, 2026

Innovative road materials from Heidelberg Materials help improve roads in the UK.

A TBM will drive a new tunnel under the the River Thames from Tilbury

Biggest Herrenknecht TBM for £11 billion UK project

by MJ woof
July 16, 2026

The UK's £11 billion Lower Thames Crossing project will use a 5,000tonne TBM supplied by Herrenknecht, the largest of its...

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited