• About
  • Advertise
  • Contact
Thursday, July 16, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home Products New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy

New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy

The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.

by Sarah Biswell
April 20, 2023
in Products
Reading Time: 2 mins read
A A
New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Sukabumi Economy

New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Sukabumi Economy

With excessive rainfall at the project site drenching the soil and presenting a high risk for potential landslides, earthworks became a significant challenge. Waskita realized that they needed continually updated information on the progress of the earthworks according to work location and had to establish a reliable database to manage and access the soil data to perform the stability analysis. Not only was it important to have timely and accurate updates on earthworks, but also reliable insight into the entire construction progress on site.

Click here for the video and case study.

Using Bentley’s integrated modeling and analysis technology, Waskita developed 3D BIM workflows and a connected digital environment that provided clear visualization of the existing site conditions and construction progress in the field. Waskita surveyed the field using drones and, with ContextCapture, processed the captured data into a 3D reality mesh. Leveraging the reality mesh model with the 3D corridor model developed in OpenRoads, Waskita quickly performed the earthworks calculations and monitoring. They then imported the earthworks and soil test data into gINT to create a digital database accessible to the team to later calculate and analyze slope stability with PLAXIS, helping optimize design and construction in locations prone to landslides. Lastly, Waskita used SYNCHRO to link the 3D BIM model with the work schedule data to simulate the construction plan and facilitate 4D construction monitoring within the connected data environment.

By going digital and automating previous manual processes, Waskita not only eliminated human errors and costly rework, but they also shortened earthworks calculations and reporting times from two weeks to three days.

Content produced in association with Bentley Systems

Promoted Content Header
Bentley Systems VIEW COMPANY
Bentley’s Blyncsy analytics solution collects high-resolution dash-camera imagery to help identify road hazards more quickly, including guardrail damage and vegetation encroachment (mage courtesy of Bentley Systems)
Products

Hawaii banks on Blyncsy

February 18, 2026
Bentley’s Blyncsy analytics solution collects high-resolution dash camera imagery from state roads to help identify road hazards more quickly, including guardrail damage and vegetation encroachment (image courtesy of Bentley Systems)
News

Hawaii banks on Blyncsy analytics

January 9, 2026
Bentley Systems continues to expand its portfolio with two strategic acquisitions, delivering AI solutions for digital twins of key assets, helping boost maintenance efficiency for clients – image courtesy of © Bryan Roschetzky| Dreamstime.com
News

Bentley buys digital technology

January 8, 2026
The Bentley Year in Infrastructure 2025 event reached its climax at the awards dinner, with the announcement of the winning entries and winners celebrating their achievement
News

Bentley Systems awards 2025

October 17, 2025

Related Posts

(Image: CIFA)

CIFA introduces the new K60H with 7-section boom: a new benchmark in the 60-metre class

by Sarah Biswell
July 10, 2026

CIFA expands its CARBOTECH range with the introduction of the new K60H with 7-section boom, a truck-mounted concrete pump designed...

Better visibility, more order, more convenience: The new SUPER 800-5 P min paver from Vögele offers numerous advantages.

Market launch for new mini road paver from Vögele

by Sarah Biswell
July 6, 2026

Market launch for new mini road paver from Vögele

The W 200 F combines high milling performance with innovative automation solutions and. in particular, addresses the needs of users looking for efficiency and flexibility in a compact machine concept.

The W 200 F with MILL ASSIST impresses on the Latin American market

by Sarah Biswell
July 6, 2026

The large milling machine combines smart machine control with automated documentation

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited