• About
  • Advertise
  • Contact
Friday, July 17, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home Products GEWI piles for Blankenburg Connection

GEWI piles for Blankenburg Connection

BAUER Funderingstechniek is installing GEWI micropiles with threads as part of Rotterdam’s new 4km-long A24 highway that includes two tunnels under the Scheur River

by Sarah Biswell
June 17, 2020
in Products
Reading Time: 2 mins read
A A
BAUER is installing the deepest GEWI

BAUER is installing the deepest GEWI piles in the Netherlands to date

The work by BAUER Funderingstechniek – the Dutch subsidiary of German parent firm BAUER Spezialtiefbau – is for the Blankeburgverbinding (Blankenburg Connection) tunnel project west of the city between the A15 and A20 highways.

Rotterdam, with a population of around 650,000, is the second largest city in the Netherlands and Europe’s largest seaport, making it an important freight transport hub. The Blankenburg Connection will relieve truck and general traffic congestion.

BAUER has been delivering GEWI material to the site since July 2019 and by May is due to have installed 4,500 piles. But preliminary pile load tests were conducted in 2018 to investigate the primary friction properties of the three soil strata at the site. Soft clay, followed by firm clay and medium-dense to dense layers of sand were detected down to a depth of up to 20m.

The design of the GEWI piles for the tunnel ramps was adjusted based on the results of the pile load tests. Installation of the pile foundation for the southern ramp of the future 30m-deep Maas Delta Tunnel began last summer.

“In total, 11 teams with 11 KLEMM KR 806 rigs are currently being used in the joint project with our partner De Vries Titan,” said Maarten Daalmeijer, project manager at BAUER Funderingstechniek. “This way we are sure to keep to the tight schedule.”

BAUER is installing the deepest GEWI piles in the Netherlands to date. Penetration of 64m below the NAP (Normaal Amserdams Peil – Amsterdam Ordnance Datum) –  a height reference point for the Amsterdam water level.

Categories: Road Structures
Promoted Content Header
BAUER GEWI

Related Posts

(Image: CIFA)

CIFA introduces the new K60H with 7-section boom: a new benchmark in the 60-metre class

by Sarah Biswell
July 10, 2026

CIFA expands its CARBOTECH range with the introduction of the new K60H with 7-section boom, a truck-mounted concrete pump designed...

Better visibility, more order, more convenience: The new SUPER 800-5 P min paver from Vögele offers numerous advantages.

Market launch for new mini road paver from Vögele

by Sarah Biswell
July 6, 2026

Market launch for new mini road paver from Vögele

The W 200 F combines high milling performance with innovative automation solutions and. in particular, addresses the needs of users looking for efficiency and flexibility in a compact machine concept.

The W 200 F with MILL ASSIST impresses on the Latin American market

by Sarah Biswell
July 6, 2026

The large milling machine combines smart machine control with automated documentation

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited