• About
  • Advertise
  • Contact
Friday, July 17, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News Colombia’s troubled Hisgaura Bridge

Colombia’s troubled Hisgaura Bridge

Maintenance is planned for Colombia’s troubled Hisgaura Bridge.

by Mike Woof
October 22, 2024
in News
Reading Time: 1 min read
A A
Located in Colombia’s Santander region, maintenance work will be carried out to the Hisgaura Bridge – image courtesy of © Pixattitude| Dreamstime.com

Located in Colombia’s Santander region, maintenance work will be carried out to the Hisgaura Bridge – image courtesy of © Pixattitude| Dreamstime.com

The controversial Hisgaura Bridge in Colombia will benefit from additional maintenance work. The construction firm that led the project to build the link, Sacyr, has been asked by Colombian road institute INVIAS to carry out the maintenance work.

The cable-stayed bridge is 580m in length, the longest of its type in South America and is part of the road connection linking Malaga and Los Curos. It is 147m high, with construction work having started in 2014 and being completed in early 2020. The design features a single traffic lane in either direction as well as pedestrian walkways on either side and spans a deep gorge that proved a barrier to travel until the construction of the bridge.

However, the US$35 million bridge gained notoriety when it opened due to its uneven deck surface. This caused considerable comment at the time, although testing carried out by Sacyr is said to show the structure to be safe for use. This additional maintenance work will further ensure the integrity of the structure.

Categories: Maintenance
Promoted Content Header
Sacyr Invias

Related Posts

A new bridge link will connect Oregon State and Washington State in the US

New $15 billion Interstate bridge between Oregon and Portland

by Mike Woof
July 17, 2026

A new $15 billion bridge will span the Columbia River in the US.

Sustainable road construction from Heidelberg Materials for North Yorkshire

Low carbon road repairs in North Yorkshire

by Mike Woof
July 17, 2026

Innovative road materials from Heidelberg Materials help improve roads in the UK.

A TBM will drive a new tunnel under the the River Thames from Tilbury

Biggest Herrenknecht TBM for £11 billion UK project

by MJ woof
July 16, 2026

The UK's £11 billion Lower Thames Crossing project will use a 5,000tonne TBM supplied by Herrenknecht, the largest of its...

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited