• About
  • Advertise
  • Contact
Sunday, July 19, 2026
Newsletter
Global Highways
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG 2026
    • Intertraffic Amsterdam 2026
    • bauma 2025
  • Latest Magazine
  • Videos
No Results
View All Results
Home News £317 million UK highway project delayed

£317 million UK highway project delayed

A £317 million UK highway project is delayed.

by Mike Woof
February 12, 2025
in News
Reading Time: 2 mins read
A A
The M25 motorway around London carries amongst the heaviest traffic of any route in Europe and improvements at Junction 10 will help reduce delays for drivers – image courtesy of © Gorgios| Dreamstime.com

The M25 motorway around London carries amongst the heaviest traffic of any route in Europe and improvements at Junction 10 will help reduce delays for drivers – image courtesy of © Gorgios| Dreamstime.com

The £317 million project to upgrade Junction 10 of the M25 motorway around London, where it meets the A3, has been delayed. The work was initially planned to be complete in mid-2025 but will now take a further nine months to finish, owing to poor weather conditions in recent months.

According to National Highways, measures will be taken to ensure that congestion does not cause a serious problem before the work has been completed. The M25 around London carries the heaviest traffic of any UK motorway and is one of the busiest routes in Europe.

The junction upgrade project is required as traffic congestion occurs regularly at this point, causing long delays for drivers. Tailbacks are common on the M25 and also on the A3 and this has caused serious concern with regard to safety, given that fast moving traffic will be passing the long queues of slow moving (or even stalled) vehicles.

Construction work for the Junction 10 upgrade commenced in mid-2022 and is intended to boost the number of lanes available at the junction, tackling the congestion problem and improving safety for drivers.

Closures will have to be carried out. One Feb 21-24, the Junction 10 slip roads onto the A3 will be closed, although drivers will still be able to use the M25.  for two weekends in March 2025 to allow two old bridges to be demolished. The motorway will be closed between Junctions 10 and 11 from 9pm on Friday March 7 and 6am on Monday March 10, and for the same period from the 21st-24th March. On April 11-14, the A3 will be closed between Junction 10 and the Cobham Roundabout/A245.

Categories: Road Structures
Promoted Content Header
National Highways VIEW COMPANY
A TBM will drive a new tunnel under the the River Thames from Tilbury
News

Biggest Herrenknecht TBM for £11 billion UK project

July 16, 2026
The bypass project for Newark in the UK has now been cancelled – (image: Wirestock/Dreamstime.com)
News

£297 million bypass project in the UK cancelled.

July 1, 2026
Building the new Lower Thames Crossing in the UK is essential to reduce traffic jams on the existing Dartford Crossing, but there is concern over the cost of the project – (image: John Kavanagh/Dreamstime.com)
News

UK £11 billion tunnel project: costs climbing

June 8, 2026
ID 100610800 ©  Gorgios | Dreamstime.com
News

£27 billion for UK road improvements

March 30, 2026

Related Posts

A new bridge link will connect Oregon State and Washington State in the US

New $15 billion Interstate bridge between Oregon and Portland

by Mike Woof
July 17, 2026

A new $15 billion bridge will span the Columbia River in the US.

Sustainable road construction from Heidelberg Materials for North Yorkshire

Low carbon road repairs in North Yorkshire

by Mike Woof
July 17, 2026

Innovative road materials from Heidelberg Materials help improve roads in the UK.

A TBM will drive a new tunnel under the the River Thames from Tilbury

Biggest Herrenknecht TBM for £11 billion UK project

by MJ woof
July 16, 2026

The UK's £11 billion Lower Thames Crossing project will use a 5,000tonne TBM supplied by Herrenknecht, the largest of its...

Join our newsletter

The mission of Global Highways is to cover the latest technologies and best practices in all areas of road, bridge and tunnel construction and maintenance, as well as their safe operation and management.

Subscribe to our newsletter

About Us

  • About Us
  • Advertise
  • Contact
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Features
  • Products
  • Videos
  • Events
  • CONEXPO-CON/AGG 2026
  • Intertraffic Amsterdam 2026
  • bauma 2025

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
  • News
  • Products
  • Features
  • Categories
    • Asphalt Milling, Paving & Compaction
    • Concrete Milling, Paving & Compaction
    • Connected Construction
    • Earthmoving & Soil Compaction
    • Engines, Components & Tyres
    • Finance & Funding
    • Highway & Network Management
    • Maintenance
    • Materials
    • Recycling
    • Road Markings, Barriers & Workzone Protection
    • Road Structures
  • Events
    • Events Calendar
    • CONEXPO-CON/AGG
    • Intertraffic Amsterdam 2026
    • bauma 2022
  • Latest Magazine
  • Videos
  • About
  • Advertise
  • Contact

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited